Optimised production systems and a customer-oriented staff means we can provide the right solution to meet every need. We are committed to delivering on time: we deliver from 16 weeks after order confirmation. We take care of the logistics and transport of the bathroom modules, which can be loaded onto trucks.
Once they arrive on site, they are unloaded and placed in the desired location using cranes (if they are lowered into place) or wheeled vehicles (if they are installed sideways). This is made possible by hooks embedded in the pod ceiling or floor, depending on the type of body: Monolite Concrete modules have hooks embedded in the ceiling, while Monolite Smart modules have hooks embedded in the floor.